Good Progress Today

Connected all supplies to the Malaga water heater and cut a hole through the floor for the gas drop vent and one for the drain valve. Also cut out a hole in the seating panel for the Malaga controller.
Fitted edging to the step at the sliding door.
Drilled a hole through the floor for the toilet sink waste and connected the waste pipe to the waste tank. Finished the permanent mounting of the waste tank.
Cut out the hole for the toiler door in the front panel and made the door. Will fit these after Wendy has insulated the wheel arch.
Made good progress today.
Will now start working on the remaining electrics.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s